Demolition Permit
Application Checklist
Planning and Development Services
15322 Buena Vista Ave., White Rock, B.C. V4B 1Y6
Phone: 604 541 2149 Fax: 604 541 2153
Website: www.whiterockcity.ca
The City of White Rock requires the following be submitted at the time of the
demolition permit application:
REQUIRED DOCUMENTS FOR DEMOLITION PERMIT ________
Application Fee (non-refundable)
Authorization Form (if applicant is not the owner)
Survey Certificate 11” x 17(showing existing location of structures and all trees on City property)
Title Search dated within the last thirty (30) days (go to www.ltsa.ca or call
604-630-9630 for information on how to obtain a Title Search)
REQUIRED DOCUMENTS FOR CONCURRENT TREE MANAGEMENT PERMIT APPLICATION ________
Tree Management Permit Application and application fee (non-refundable)
Topographical Survey showing all trees on subject property, immediately adjacent private
properties and adjacent City Boulevards (Original drawing signed and sealed by a BC Land
Surveyor)
Arborist Report c/w coordinated tree survey required for properties falling within the
Tree Management Area (Original report signed by Arborist)
Tree Securities to be paid prior to issuance of Phase 1 (Demo TMP)
REQUIRED DOCUMENTS PRIOR TO ISSUANCE OF DEMOLITION PERMIT
Copy of notice of project to WorkSafe BC
Issued Tree Management Permit
Contact Information and valid City of White Rock Business Licence for Demo Contractor
Confirmation the construction site safety fencing has been installed
K:\...TAOF\Building\Handouts\Demolition Permit Application Checklist October 2023
FEES REQUIRED PRIOR TO ISSUANCE OF DEMOLITION PERMIT
APP. FEE
Demo Application Fee
$86.00
$
DEMO
PERMIT
FEES
Demolition SFD/Duplex
$1,182.00
$
Demolition Commercial/Multi Family Demolition
$1,407.00
$
Accessory Building
$91.00
$
Moving Building
$224.00
$
Underground Storage Tank Removal
$237.00
$
SEWCOFF
Sanitary cap off fee (per connection)
$150.00
$
Drainage cap off fee (per connection)
$150.00
$
BONDRD
Road and ROW Security Deposit
$5,000.00
$
TOTAL
$
PLEASE NOTE:
Ravine Land and Significant Stands of Mature Trees designated properties are subject to a Minor
Development Application and additional documentation may be required.
Issuance of Demolition Permit is subject to a Pre-Demolition Inspection (completed by
Municipal Operations).
Refer to Part 8 of the BRITISH COLUMBIA BUILDING CODE governing construction and public
safety measures and all other applicable enactments.
Excavation is not permitted until Building Permit has been issued.
Burning is not permitted.
If the demolition contractor changes after the permit is issued, the permit is invalid until
Planning and Development Services has been notified.
AFTER THE DEMOLITION PERMIT IS ISSUED:
Contact and obtain approvals from the appropriate parties for the disconnections of 3
rd
party
utilities (BC Hydro, Gas, etc).
Water service disconnection must occur prior to demolition. The owner can choose to have
temporary water or no water.
o Visit www.whiterockcity.ca/313/Water-Service-Disconnection to begin the process
Cap-off for sanitary and drainage services must occur prior to demolition. The owner must
expose sanitary and drainage connections at the property line.
o Call 604-541-2181 to schedule an appointment
A demolition inspection is required once all work is complete
o Call 604-541-2135 to schedule an appointment
Demolition permit will not be completed until water service disconnection and
sanitary/drainage cap off occurs.